How does the solar rebate (STC) work in 2026?

Systems under 100 kW create small-scale technology certificates (STCs) based on size, location and the years left in the scheme. We claim them on your behalf and take the value off the invoice — on a 6.6 kW Sydney system that is roughly $1,800. The scheme steps down every January until it ends in 2030, so the discount shrinks each year.

What payback should I expect?

Sydney homes with a daytime load typically see 3–5 years on a 6.6–10 kW system. Commercial sites on demand tariffs usually land between 3 and 6 years. We model your actual bill and interval data rather than quote an average — payback is in every proposal, with the assumptions listed.

Do I need approval from Ausgrid or Endeavour?

Yes. Every grid-connected system needs a connection agreement from your distribution network service provider (DNSP). Under 30 kW per phase is usually pre-approved with an export limit; larger systems need a technical assessment that can take 2–6 weeks. We lodge and manage the application as part of the job.

What warranties come with a Fordan system?

Panels carry a 25-year performance warranty and typically 12–25 years on product; inverters 10 years; batteries 10 years. On top of that we give a 7-year workmanship warranty on our own installation, and because our crews are in-house there is one company to call if anything needs attention.

How big a battery do I need?

Size it to your evening and overnight use, not to the biggest box available. A typical Sydney home uses 8–12 kWh between sunset and sunrise, so a 10–13.5 kWh battery covers most nights. If backup matters, we also check which circuits you want to keep running and for how long. Our calculator gives a first estimate; interval data gives the real answer.

Can a commercial system be financed with no upfront cost?

Yes. A power purchase agreement (PPA) or an operating lease puts the capital with a funder and you pay a monthly amount or a per-kWh rate that is normally lower than your grid cost. Typical minimum size is 30 kW with a 10–15 year term. See the Finance & PPA page for a side-by-side worked example.

How much maintenance does solar need?

Very little, but not none. We recommend an inspection every 1–2 years for homes and annually for commercial sites — checking isolators, connectors, mounting and inverter logs — plus cleaning if your roof collects dust or bird mess. Monitoring alerts us to a drop in yield before you notice it on the bill.

How long does it take from quote to switched-on?

Homes: usually 3–6 weeks from signed quote, depending on DNSP approval and equipment. Commercial systems run about six weeks for sites under 100 kW and longer where a network technical assessment or council approval applies. We give you a dated program at contract signing.

Figures are indicative for Greater Sydney at time of publication and change with scheme rules and tariffs. Your proposal will show the current numbers.